Rip all warrens within 1km of permanent water, and within 3km of established breeding sites.Rip beyond the boundary of the last burrow to ensure all tunnels are collapsed.Larger tractors and dozers are more appropriate for properties with many warrens as they can move faster and rip wider. An excavator and bucket can also be used to dig through the warren following and collapsing tunnels. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |